The work you have done is amazing. We can’t thank you enough. What a transformation! Highly recommended.
Project Name: Irlam Train Station.
Client: Main Contractor
Location: Irlam, Salford.
Floor Used: Ted Todd
Range Signature Solid
Construction:Solid Wood
Width: 160mm
Length: Up to 2200mm
Depth: 20mm
Finish: Satin Lacquered
Floor Area: 316m2
Completion: 12 days
Installation of Solid Wood Flooring Salford
PROJECT OVERVIEW:
The redevelopment of Irlam Train Station was thanks to the great partnership work between Hamilton Davies Trust, Salford City Council, North Cheshire Developments, Transport for Greater Manchester, Network Rail, Northern Rail and the Friends of Irlam Station who have combined resources to give the station the makeover it badly deserves.
One of our master fitters Chris Blink was appointed to assess, design and install the solid wood flooring throughout the both the ground and first floor.
SUBFLOOR PREPARATION WORK
This project required an Epoxy Surface Damp Proof Membrane before receiving latex screed.
INSTALLATION
The floor was installed by our Wood Flooring Fitters.